Follow us :

Mobile static grounding solutions with cables

Mobile static grounding solutions with cables
Mobile static grounding solutions with cablesMobile static grounding solutions with cablesMobile static grounding solutions with cablesMobile static grounding solutions with cablesMobile static grounding solutions with cables
FOB Price

US $93.75 - 50 piece

US $86.951 - 100 piece

US $75.0101 - 1000 piece

group name
Static Grounding Monitoring System
Min Order
5 piece
brand name
ALPTEC Static Grounding Solutions Manufacturer
model
SA-YP
Nearest port for product export
Qingdao Port
Delivery clauses under the trade mode
FOB, CFR, CIF, EXW
Acceptable payment methods
T/T, D/P D/A, PayPal, Westem Union
update time
Thu, 21 Nov 2024 14:31:07 GMT

Paramtents

  • Structure 1 SA-Y clamp+ 5m spiral cable+1 SC-02 clamp

  • Clamp Material Aluminum

  • Cable Material Copper

  • Cable Length 5m

  • Gross Weight 1.6kgs

Packging & Delivery

  • 42cm x20cm x21cm
  • Min Order5 piece

Briefing

The case introduces the usage, characteristics and maintenance of Mobile static grounding solutions.

Detailed

1. Introduction

The accumulation of static charges during the fueling transfer process can lead to costly explosions, fire and personnel injury. The Grounding Clamp to discharge static and verify proper grounding. Mobile static grounding solution is intrinsically safe for use in hazardous locations.

2. Advantages

1. Low energy consumption design of Self testing clamps with visual indication makes battery replacement unnecessary during normal operation. 

2. Audible and visible alarms 

3. Digitron resistance display 

4. After 1 minutes' continuous alarm it will be in the resting status and it will return to normal in a closed circuit. 

5. Circuit part is totally enveloped by epoxy resin which makes it damp-proof, rustproof, erosion-proof and shock-proof. 

6. The static grounding clamp can penetrate the paint and rust and insure the bodywork is effectively grounded.

7. It insures the resistance between the tanker truck and the ground stud not bigger 10Ω (meeting the state standard of less than 100Ω).

8. The coat of the ground cable is made of special rubber with the characteristic of high or low temperature-proof, corrosion-proof and oil-proof.

9. The standard cable length is 5 m. Other length is available upon request.

3. Specifications

1. Response time: <2s
2. Alarm volume : >90dB (measured by a-30cm straight distance)
3. Battery: Lithium battery(3.6V)
4. Ambient temperature:-40 to+60℃
5. Explosion-protection Mark: Exia IICT4G
4. Types
Model:SA-YF(Fixed)    
Cable length:5m(16.4ft.)          
Clamp:SA-Y(visible and audible alarms) 
Lug:60A(SC35-10,φ10MM)  
Model:SA-YP(Mobile)
Cable length:5m(16.4ft.) spiral cable
Clamp 1: SA-Y(visible and audible alarms)
Clamp 2:SC-02
5. Package


Packaging: cartons(10 pcs in one carton)

Dimensions:45*35*16 cm

Gross Weight: 15.0 kgs

Delivery time: 2 days after payment

Delivery: by sea or courier such as FedEx, DHL, TNT, UPS




6. Company Information

Established in 1996, Qingdao Alptec Safety Equipment Co., Ltd specializes in the design, manufacture, and supply of high-quality Overfill Protection as well as Static Grounding Systems, Earthing Clamps, Reels and accessories for the chemical, petrochemical, oil and gas and process industries that transport, store, transfer and use flammable liquids, solvents or combustible liquids in hazardous areas.


Alptec is Sinopec and PetroChina's preferred brand and we have secured more than 50% of the market share in China. Internationally we began exporting in 2006 to Germany, Spain, USA, Canada, Australia &New Zealand, Korea, Singapore, Thailand, Vietnam, Mexico, Brazil, South-Africa, India, and many other countries.


We aspire to be your trusted supplier.

7. Usage
1. When using the SC series static grounding clamps, open the clamp, clip the clamp on the equipment to be grounded, shake the clamp to get rid of the paint or rust to ensure good contact. Open the clamp and remove it after using. 

2. When using the PC and CC series static grounding clamps, unscrew the bolt until the clamp can be fixed to pipes or flat materials, and then tighten the bolt to ensure good contact. Unscrew the bolt and remove the clamps after using.

 3. When using the PC and CC series static grounding clamps, fix one end according to the method above and then fix the other end.
8.  Operation Procedures 
Step1: Open the clamp, there will be alarm; if you hear no alarm, please go to 7.0 Trouble Shooting.
 
Step2: Clip the clamp on the tanker truck and shake the clamp to remove the paint or rust until no alarm stops. 

Step3: After the loading operation has been finished, pick up the clamp from the tanker truck and put it back on to the original place. 
9.  Installation